Port Authority Bus Terminal

The owner of the project, the Port authority of New York and New Jersey, selected world renowned architecture firm STV Inc. to perform the design work. STV has a long history of excellence with respect to transportation facilities; when they were tasked by the developer to design the aforementioned advancements, FSC was immediately brought on board to provide the 3D rendering and animation that would be used to support the developer’s presentation leading to final investment decision (FID).

After FID, FS Consulting was retained to provide architects to serve throughout the design and construction phases.

FSC performed production work on the construction documents, as well as a large portion of the ongoing engineering that is common post-construction.

Project Data Sheet

Share
Date:
January 29, 2016